How we check each facility
The directory starts with the FDA establishment identifier. We use it to isolate device listings for each facility and then check public process descriptions and certificates against the operation they cover.
Registration and product codes
The launch directory contains 60 facility rows from the 16 Nov 2026 openFDA snapshot, checked on 28 Nov 2026. openFDA refreshes registration and listing data monthly. FDA registration and device listing describe the establishment and its activities. Device approval or clearance requires separate evidence.
We query by FEI and retain only listings that explicitly include the contract-manufacturer activity. The code count deduplicates product codes across those listings. Device classes come from openFDA’s product-code metadata and are ordered by code frequency within each facility. The expiry year is the year printed in the registry response.
Process and ISO evidence
Facility and campus pages supply process, cleanroom and production-scale fields. The ISO certificate field comes from a public issuer document linked by the supplier. Check the scope, the included address and the expiry on that document. Live certificate standing is confirmed with the issuer.
A blank cell calls for a supplier check. Procurement teams can use the source links to confirm the operation that would handle their product.
Recall matches
We looked for FDA device enforcement reports published between 29 Nov 2021 and 28 Nov 2026. Counts combine reports with the same FDA event ID after matching the reporting firm and street address to the facility. This field measures reviewed reporting matches. It cannot establish who manufactured or caused the issue. A blank cell conveys no finding.
Registration history
The history series joins matched FDA bulk files by registration key and listing ID, then deduplicates US facilities by FEI. It records when a facility enters or leaves the set of public contract manufacturing listings.
Quote benchmark
The survey specification is a Class II nonsterile molded-and-assembled part, with an OEM-supplied design and a pilot lot of 1,000 units. A shared specification fixes tooling, materials, tolerances, packaging and acceptance criteria before quotes are collected.
Publication requires at least five independent vendor responses to the same specification and a one-month lag. The public result is the median and range for setup cost and prototype-to-pilot lead time. Small or identifiable subgroups are suppressed.
Corrections and downloads
Send corrections with the facility’s FEI and a public source to hello@medicaldevicecontractmanufacturers.com. Download the CSV or the JSON with sources.
The directory compilation is available under CC BY 4.0. The FDA supplies its source data under its openFDA license.